Manpower Planning, Scheduling and Tracking of a Construction Project Using Microsoft Project Software

Authors

  • Abhishek sharma National Institute of Technical Teachers’ Training and Research, Bhopal (M.P.), India
  • K.K. Pathak National Institute of Technical Teachers’ Training and Research, Bhopal (M.P.), India

DOI:

https://doi.org/10.15415/jotitt.2015.32011

Keywords:

Microsoft Project Software, manpower planning in construction projects, manpower schedule construction

Abstract

Many project suffers time and cost overruns due to improper planning, scheduling and execution works that results in several issues like delay in providing facilities, development, reduction in quality of construction and making the project more expensive. A little consideration shows that the time required to complete the project is inversely proportional to the supply of manpower. As the manpower is increased, the completion time of the project is decreased and on the other hand if the manpower is decreased, the completion time of the project is increased. The present study deals with the manpower planning, scheduling and tracking of “Construction of a Residential Block at Mahadev Parisar, Bhopal”, a six storied (G+6) building project whose construction is in progress at Shivaji Nagar, Bhopal, Madhya Pradesh. A comparison between the baseline duration and cost to actual duration and cost of manpower of the project is also determined using the project management software tool Microsoft Project 2013.

 

Most Searchable Keywords

manpower schedule sample for construction, construction manpower schedule sample, how to calculate manpower requirement in construction, manpower planning in project management, project manpower planning template,
manpower and material tracking software, construction manpower planning, microsoft project construction schedule

Downloads

Download data is not yet available.

References

[1] Central Public Works Department, Analysis of Rates for Delhi ( Vol. 1 ), Director General, CPWD, Nirman Bhawan, New Delhi, 2012.
[2] Central Public Works Department, Analysis of Rates for Delhi ( Vol. 2 ), Director General, CPWD, Nirman Bhawan, New Delhi, 2012.
[3] PMBOK, A Guide to the project management body of knowledge, 2000.
[4] K.K. Chitkara, “Construction Project Management” Tata McGraw Hill, Tenth Edition, 1998.
[5] Hamed, Hamdreza, Matin, Mohamdmahi, “Using Primavera Software in Resource Allocation and Project Evaluation of Construction Projects”, Interdisciplinary Journal Of Contemporary Research In Business (IJCRB), Islamic Azad University, Rasht, Iran, Vol. 4 , No. 12, April 2013.
[6] Paul E. Harris, Planning and Scheduling using Microsoft project, BPS Publications, New Delhi, 2014.
[7] Ismail Abdul Rahman, Aftab Hameed Memon and Ahmad Tarmizi Abd. Karim, “Significant Factors Causing Cost Overruns in Large Construction Projects in Malaysia” Journal of Applied Science 13 (2): 286-293, ISSN 1812-5654, 2014.
[8] S. Seetharaman, Construction Engineering and Management, Umesh Publication, New Delhi, Fifth Edition, 2014.
[9] Carl Chatfield, PMP, Timothy Johnson and MCTS, Step by Step, Microsoft Project 2013, Practice file plus ebook, published by Microsoft press, 2013.

Downloads

Published

2015-12-17

How to Cite

Abhishek sharma, & K.K. Pathak. (2015). Manpower Planning, Scheduling and Tracking of a Construction Project Using Microsoft Project Software. Journal on Today’s Ideas - Tomorrow’s Technologies, 3(2), 161–169. https://doi.org/10.15415/jotitt.2015.32011

Issue

Section

Articles